Our Solution
Filmtek Data Solutions (FDS) installed FT400 EXT 4mil Clear External Safety Film across the affected elevations, essentially architectural glazing. This was paired with a structural silicone edge retention systems, creating a robust barrier that keeps shattered glass in place, reducing risk of injury or fallout.
Outcome
The Phase 1 installation delivered immediate safety assurance to residents and building managers. The project is now poised for Phase 2, which will extend film application across additional elevations, incorporating solar control and energy reduction features.
Islington Wharf, known for its striking architecture and expansive glass façades, now benefits from an enhanced safety profile—without compromising its visual appeal.